Friday, 16 June 2017

PWI awarded with new COOP job




P&W Interiors have been awarded the job of a full COOP refit.
Work is due to commence in September

For more information on our work visit www.pacy-wheatley-interiors.co.uk

Wednesday, 17 May 2017

Pacy & Wheatley Interiors | Work Commences at Marriott Hotel, Heathrow Airport

Work Commences at Marriott Hotel, Heathrow Airport

Pacy and Wheatley Interiors are proud to commence work within the function and Banqueting  facilities at Marriott hotel at Heathrow Airport.



For more information on our services and other projects visit our website:

Tuesday, 2 May 2017

Pacy Interiors | Refurbishment at Bridlington Spa

Refurbishment at Bridlington Spa

Client: Bridlington Spa
Sector: Leisure
Type: Retail & Leisure
Procurement: Tender / Negotiated
Location: Bridlington
Project Value: £200,000

The Project

Pacy and Wheatley Interiors became involved with a retail refurbishment, at Bridlington Spa, through the Yorbuild framework. We worked with East Riding council to create a new bar and complete the remodeling of the main space to provide a modern and contemporary feel. The refurbishment also included a new flooring and bar to the entire reception entrance with views of the south Bay.
The original Spa on the site was built in 1896, which consisted of a theatre and seaside pavilion. A fire in the theatre destroyed the venue in1906 and a then a replacement opera house was built in 1907, and this still forms part of the building today. In 1914 the local authority took control of the buildings, acquiring the building in 1919, then in 1926 rebuilt all but the theatre. In 1932 another fire destroyed these later buildings, and immediately work started to construct their replacement, which is what you see today.

The Solution

Our experience in this field was called upon to assist with the design and construct of the project. The work had to be carried out whilst the spa was in operation and required managing very carefully. The existing bar was removed and the area stripped back to allow new finishes and installation to the floors and walls, the bar now offers new ranges of food and cakes for a relaxing afternoon overlooking the bay.
The project was completed and officially opened by the Mayor of Bridlington on the 24th March 2017 ready for business.

For more of our services and other case studies visit out website

Friday, 24 March 2017

Pacy Interiors | Work for Hugo Boss

Work for Hugo Boss carried out by Pacy Interiors

Pacy & Wheatley have began work for Hugo Boss carrying out a refit for a new store in Meadowhall, Sheffield.



More Updates will follow

Pacy & Wheatley 
Belvedere House
113 Thorne Road
Doncaster
DN2 5BQ
Telephone: 01302 760843

Visit our website more information on our services and other case studies:

Friday, 24 February 2017

Pacy Interiors | Interior Fit Out Shoreham

Interior Fit Out in Shoreham


  • Client: Albox Services
  • Sector: Storage Solutions
  • Type: Specified
  • Procurement: Tender
  • Location: Eastern Avenue, Shoreham
  • Project Value: £240,000
  • The Project

    Pacy and Wheatley Interiors have completed an Interior Fit Out project in Shoreham for Albox Services. The client purchased an existing unit which was a former soft drinks facility. The particular building had been empty for some time and needed major renovation works to be done including a new roof, external cladding and new drainage. A full demolition of the existing internal blockwork and offices took place before a new Mezzanine floor was installed, making the storage facility ground and first floor. Pacy & Wheatley then commenced the fit out of the unit which consisted of building 2 new fire staircases, the formation of a new external reception, this was required so that the storage space could be maximised. New toilets and rest room were installed to include the formation of a number of meeting rooms. We also formed a new loading area which included a facility for 24 hour access by means of a set of auto sliding doors and key pad secure entrance system. Health and safety on this project needed to be of the highest order as there were also a number of nominated other trades such as Mezzanine floor fitters, Electricians and Lift installation engineers working on site, some at high level. The effective way in which the site was managed from a health and safety perspective resulted in zero accidents throughout the whole project.
  • The Solution

    The issue on this project were that we had a substantial amount of external repair works to carry out prior to the main fit out commencing which needed to be completed very quickly in order to be able to work safely inside the building. We also had to work alongside the Mezzanine installers, Electricians and lift installers, the new roof was also being installed at the same time. This resulted in various logistical meetings to ensure all trades could work together to progress the project to programme in a safe and timely fashion. We had weekly meetings with all the various package contractors in attendance along with the appointed Architect and client which was essential to ensure that the project achieved handover to the store on time. This project commenced and completed in 13 weeks and was most challenging but with everyone pulling together the end goal was achieved on time and on budget and to the clients satisfaction.



Friday, 20 January 2017

Pacy Interiors | Bespoke Joinery

PACY WHEATLEY INTERIORS

Bespoke Joinery

Pacy and Wheatley Interiors recognise that many interior projects, be it shopfitting or office refurbishments, can require bespoke joinery solutions, and we are delighted to offer our expert Bespoke Joinery contractor solutions nationally.
From Timber Door Sets and Frames, Glazed Screens, Staircases, Bars, Reception Desks, Fitting rooms, Office Break Out Areas, Cash and Checkout Terminals, to Self Check Out areas, we have done it all.
As part of the Pacy and Wheatley Group we are used to all sized projects from a franchised KFC Drive through to Costa Coffees, all the way to major Healthcare facilities and residential developments. You can rest easy knowing your project is in safe hands and will be delivered on time, on budget with minimal snagging.
If you have some idea for your bespoke joinery requirement, we can work from a rough sketch to full CAD or 360 imaging and provided it's less than 10MB, you can use our Tender Upload facility, which comes directly to me, Craig Wheatley, Divisional Director, you will receive a response Monday to Friday within 24 hours, or if you would like to discuss how Pacy & Wheatley Interiors can help with your project please Contact Us.
Return Back To Our Website HERE
Social Media Managed By Multi Web Services

Friday, 16 December 2016

Pacy Interiors | Commercial Decorator


PACY WHEATLEY INTERIORS


Commercial Decorators

Pacy & Wheatley Interiors provide a high quality commercial Painting and Decorating contracting services to the Retail, Leisure and Healthcare Industries nationally.
Founded in 1968 we understand as well as any national or local painting and decorating contractor, that even an exceptional installation can be rubbished by poor painting and decorating. We have worked with some of the worlds premier brands, KFC, Costa Coffee, Rolls Royce, Oxford University and many more, if you would like to view some of these projects please view our Pacy & Wheatley Acoustics website.
To offer further assurances on the quality of our clientele and works please view some of our 'Turn Key Case Studies' design and build projects from Pacy & Wheatley construction.
On occasions we are able to accommodate short notice contracts, if you have a project that requires urgent attention, please use our Tender Upload facility, which goes directly to me, Craig Wheatley, Divisional and Main Board Director; I will respond within 24 hours Monday to Friday, or if you would like to discuss in detail your project please Contact Us.



Return Back To Our Website HERE
Social Media Managed By Multi Web Services


Friday, 25 November 2016

Pacy & Wheatley Interiors | Suspended Ceilings


PACY WHEATLEY INTERIORS

Pacy & Wheatley Interiors offer as part of their comprehensive interior shopfitting and fit out services, Suspended Ceilings and are the UK's premier national installation ceiling contractor.  
In addition to our very competitive suspended ceilings installations, our Acoustics Division offers specialist Seamless Acoustic Plaster ceilings and walls, and we have provided expert acoustic solutions to some of the finest and well renowned brands in the world from Rolls Royce, as well as the great banking halls within the bank of England and some of the great halls at Oxford University, rest assured you are in very safe and expert hands.
From standard metal framed permanent suspended ceiling lined with plasterboard, acoustic variations and into de-mountable lay-in-grid systems, there are a great many options to choose from. Design parameters will narrow these choices, but Pacy & Wheatley Interiors work with clients to find the best solution to suit the project requirements and also cost planning.
If you have an urgent project please use our Tender Upload feature which will allow you open your computer files and attach files and images up to 10MB, which will be emailed directly to me, Interiors Divisional Director, Craig Wheatley. I'll respond within with 24 hours Monday to Friday. If you would like to discuss how we may help with your project please Contact Us.

Return Back To Our Website HERE

Social Media Managed By Multi Web Services


Friday, 30 September 2016

Pacy Interiors | Dry Lining and Partitions


Dry Lining and Partitions

Pacy & Wheatley Interiors are one of the UK's premier national Dry Lining and Office Partition contractors. 
Specialising in DryWall and Lightweight Steel Framing and Stud Partitioning Systems, our Acoustics Division can also offer additional enhanced solutions where reverberation or noise control is required. Pacy & Wheatley Interiors recognise the fine balance between quality and cost, as well as always delivering the project on time and on budget.
Pacy & Wheatley Interiors are a division of the Pacy & Wheatley Group so rest assured all our Dry Lining and Partition services are in accordance with the strict requirements of the major manufactures such as British Gypsum and Knauf.
We have an instant response Tender Upload facility that allows you to open your computer files and attach up to 10MB of files, this facility always gets through our spam filters and goes directly to the divisional director Craig Wheatley, and I will call you within 24 hours Mon-Fri to see how we may help with any urgent requirements.



Visit our Website for more services and our case studies!


Friday, 27 May 2016

Case Study | Fire Prevention Works, South London

Fire Prevention Works, South London

Cooperative Fire Prevention Works Exterior

  • Client: The Cooperative Group
  • Sector: Fire Prevention Works
  • Type: Schedule of rates
  • Procurement: Tender/Negotiated
  • Location: Cooperative Store Streatham - South London
  • Project Value: £75,000

The Project

Cooperative Fire Prevention Works InteriorPacy and Wheatley Interiors have completed Fire Prevention Works in South London. We were approved and appointed to carry out works on a rolling programme for the Cooperative group. This particular project mainly involves Fire Prevention Works, also with repairs to new doors and ceilings. Part decoration to the retail area and back of house was also completed along with a thorough sparkle clean to the sales area floor and external windows and pavement.
This particular Coop store was on the corner of a busy high street in Streatham South London so logistically it was very challenging as the main bulk of the works were carried out on nightshift.
We had 15 days to complete everything on the agreed scope of works. Despite the many obstacles we had to deal with, the project was completed on time.

The Solution

Cooperative Fire Prevention WorksThis particular Fire Prevention project was very challenging
with the need to fire proof all the steel
girders installed within the sales and back of house areas as well as install a new suspended ceiling
across all of the sales area. The solution here was to ensure that the store was fully fire proofed to 60
minutes which is a requirement when residents are living above the store and also to in essence carry
out a mini refit with the decoration and installation of new doors being carried out at late notice.
The end result was another tough project completed successfully, on time and on budget, carried out
on a very demanding South London high street location and to a very high standard. The project
achieved zero accidents and the staff and customers have been left with a fresher, cleaner and brighter
looking store, now with compliant Fire Prevention Works completed.
For further information on how we can help with your Interior refurbishment or shop fit, please Contact Us.

Friday, 29 April 2016

Pacy Interiors | Interior Fit Out

Interior Fit Out

Pacy & Wheatley Interiors are specialist national Interior Fit Out Contractors with over 40 years experience.
We are proud to have worked with household names and brands such as Heston Blumenthals restaurant, in the Mandarin Oriental Hotel, London, and the great banking halls within the Bank of England, and we are the company of choice when it comes to interior refurbishment or fit outs.
Our office fit out and refurbishment services focus on delivering enhanced and improved space use as well as major aesthetic improvements that offer significantly improved working habitats for your teams. Our professional approach to project management, ensures that we continue to be the partner of choice for occupied buildings, high quality specifications, restricted site access and out of hours contracts.
Our impressive group portfolio of clients and over 70% client repeat business, offers assurance that Pacy and Wheatley Interiors are able to refurbish or fit out your project, regardless of size. 
If you would like to discuss your project please either attach your Tender Documents or Contact Us. 

Friday, 25 March 2016

Pacy Interiors | Shop Fitting

Shop Fitting
Pacy & Wheatley Interiors are national Shop Fitting contractors and are able to offer a professional and comprehensive Shop Fitting projects to the Retail, Commercial, Healthcare and Leisure industries throughout the UK. Our four decades of experience in the construction and shopfitting sectors have defined our smooth processes, client communications, project management all leading to a near perfect project handover.
Ensuring that your brand and products are presented in a modern and aesthetically appropriate environment does increase your average sales per sq foot, or basket size. Our design team can help create new trial concept retail environments, maximising linear displays whilst ensuring that walkways and customer subconscious in store movements are carefully engineered, improving previously poor performing areas in your store. Staff performance can also be improved with more modern environments that create enhanced work force satisfaction.
Many projects that we undertake are in occupied premises, much of the time in operational areas and our clients can be safe in the knowledge that the project is in the hands of a professional and competent contractor. All our clients can rest assured that regardless of the project size Pacy & Wheatley Interiors will provide the same attention to detail, quality and project delivery.
If you would like to discuss your Shop Fit project, please Contact Us.

Friday, 29 January 2016

Suspended Ceiling Refurbishment | Rotherham

Suspended Ceiling Refurbishment in Rotherham

Wilko Suspended Ceiling
Wilko Suspended Ceiling Rotherham
Suspended Ceiling Rotherham
Wilko Suspended Ceiling Refurbishment
Suspended Ceiling Refurbishment
  • Client: The Wilko Group
  • Sector: High Street Retail
  • Type: Specified
  • Procurement: Negotiated
  • Location: Corporation Street, Rotherham
  • Project Value: £20,000

The Project

Pacy & Wheatley Interiors complete a Suspended Ceiling refurbishment in Rotherham,Yorkshire for the Wilko group. We were approached regarding a roll out of full ceiling tile changes to the sales floor in various stores across the country. The works were undertaken out of hours, commencing as the store closed at 1800hrs and handing the store back to the duty manager at 6am. We had a phased programme to work to with designated areas of the store being allocated for each night. The works needed to be completed over 5 nights.
The tight programme was very challenging as it was not just a case of swapping ceiling tiles. This particular ceiling had originally been installed over 18 years ago and various areas of it were in a bad state of repair, there was a lot of remedial works to complete with the original hangers and fixings having either fallen off or were missing. The existing grid was also to be maintained, which again was in a poor state of repair. We were also requested to clean the grid as we replaced the ceiling tiles, this again was difficult and time consuming as the grid was very dirty and thick with black smoke stains caused by the heating and ventilation system. A large part of the works involved protecting the stock and gondola shelving from the dust and debris that fell from the ceiling once the tiles were removed. This required lightweight plastic sheeting to be used, removed and relocated to suit the phasing of the works. Once the existing plastic protection was removed following completion of the phased area we then had to carefully vacuum and clean down the flooring and shelving before commencing with the next phase.
This project although small in size was very logistically challenging as we could not send any plant or materials into the store during trading hours and there was also no room to place a skip. This meant that we had to physically collect pallets of tiles on a daily basis and deliver them to the store. We also had to fill our vans up every night with the old ceiling tiles and take them to a warehouse 10 miles away for disposal. This procedure was repeated every day until project completion. Health and safety was of paramount importance whilst these projects were ongoing as there was obviously working at height and lifting involved. This was managed very efficiently and resulted in a zero accident project being achieved.

The Solution

This particular store is set on a very busy high street and as detailed above very logistically
challenging. The solution is that the store has now got what looks like a brand new Suspended
Ceiling to the sales area resulting in a lighter and brighter feel when shopping here. The process
 was very well managed by P&W interiors working alongside Bardo Electrical who carried out
 lighting changes and Electrical safety work during the project. This was a very good team effort
 with everyone working together to ensure that the project handed over on time and on budget
 and to the clients full satisfaction. Another difficult and challenging high street project handed
over with zero accidents achieved.
For further information on how we can help with your Interior refurbishment or shop fit, please Contact Us.

Wednesday, 23 December 2015

Magnet Kitchens Islington | Pacy Interiors

PACY & WHEATLEY INTERIORS!


New Magnet showroom fit out began 2nd November in Islington



Week 2 progress at the Magnet store in Islington



Week 3 progress Magnet Islington



Progress continued at Magnet Islington! 
Externals, signage installed.



Week 6 progress at the Magnet store in Islington. 
We handed over on Monday, December 14th!


Wednesday, 25 November 2015

Interior Refurbishment – East Sussex


Interior Refurbishment – East Sussex


The Co-op Exterior East Sussex
  • Client: The Cooperative group
  • Sector: Retail – Fire prevention works
  • Type: Schedule of rates
  • Procurement: Tender/Negotiation
  • Location: Cooperative store Winchelsea – East Sussex
  • Project Value: £17,000.00

The Co-op Interior Counter East SussexThe Co-op Interior East SussexThe Project

Pacy and Wheatley Interiors complete an Interior Refurbishment project in East Sussex. We were approved and appointed to carry out works on a rolling programme for the Cooperative group, this particular project mainly involves Fire prevention works with repairs and decoration being carried out within the retail area.
The vast amounts of existing Cooperative stores are on high streets or busy side roads and as such many of them have flats/apartments above the shop. It was found following a routine visit by a fire officer to a certain store that the fire prevention between the shop and the accommodation above was totally inadequate or non-existent. Subsequently leading to all of the Cooperative stores being surveyed and a scope of works being put together with a view to a rolling programme of fire prevention works being carried out for a total of 3 months from October this year.

The Solution

The programme of works commenced as detailed above. The works involved following on from
the scoping visits varied significantly, some stores requiring minor works and others needing store
closures with ceilings having to be removed whilst steel columns above were fire proofed to achieve
60 minutes protection.

This particular project was very challenging indeed with the need to fire proof all the steel girders
installed within the back of house area. The challenge here was that there was a very small void
above the ceiling and a myriad of cables located within the working area. The solution was to bring
in an Electrical contractor to identify and label the existing wiring that was to be kept and check and
remove the redundant wiring. The remaining wiring was then laid neatly into Galvanised trunking,
this enabled better and safer access to the steels and walls that needed to be fire proofed.
This particular store formed part of a row of shops and on closer inspection it was found that there
was no fire prevention installed between each unit meaning that if a fire started then there was no
means of stopping the fire spreading. The solution here was to install a 60 minute fire curtain
between the Cooperative store and the hair dressers salon next door so as to stop the risk of fire
spreading.

The whole of the back of house area was fully decorated and a brand new suspended ceiling installed,
the end result being a safer fire proofed area for the staff to work in along with a fresher and brighter
feel to the whole area, another successful Interior Refurbishment completed.

For further information on how we can help with your Interior refurbishment or shop fit, 
please Contact Us.

Friday, 23 October 2015

2 New Updates!



We have completed another Interior refurbishment!


----------------------------------------------------------------------------------------




Thanks for the business guys...


----------------------------------------------------------------------

We also have a new van with our design on the side!