P&W Interiors have been awarded the job of a full COOP refit.
Work is due to commence in September
For more information on our work visit www.pacy-wheatley-interiors.co.uk



Pacy and Wheatley Interiors became involved with a retail refurbishment, at Bridlington Spa, through the Yorbuild framework. We worked with East Riding council to create a new bar and complete the remodeling of the main space to provide a modern and contemporary feel. The refurbishment also included a new flooring and bar to the entire reception entrance with views of the south Bay.
Our experience in this field was called upon to assist with the design and construct of the project. The work had to be carried out whilst the spa was in operation and required managing very carefully. The existing bar was removed and the area stripped back to allow new finishes and installation to the floors and walls, the bar now offers new ranges of food and cakes for a relaxing afternoon overlooking the bay.
The issue on this project were that we had a substantial amount of external repair works to carry out prior to the main fit out commencing which needed to be completed very quickly in order to be able to work safely inside the building. We also had to work alongside the Mezzanine installers, Electricians and lift installers, the new roof was also being installed at the same time. This resulted in various logistical meetings to ensure all trades could work together to progress the project to programme in a safe and timely fashion. We had weekly meetings with all the various package contractors in attendance along with the appointed Architect and client which was essential to ensure that the project achieved handover to the store on time. This project commenced and completed in 13 weeks and was most challenging but with everyone pulling together the end goal was achieved on time and on budget and to the clients satisfaction.